Home/Blog/Security & Compliance
Security & Compliance · 11 min read

How to Write a Carbon Reduction Plan (PPN 006) for a Small Business

The short answer

A Carbon Reduction Plan (CRP) is a board-approved document that reports your scope 1, scope 2 and five scope 3 categories, commits to net zero by 2050 at the latest and lists your reduction measures. To write one: fix your boundary, collect a year of activity data, apply official emission factors, set a target, cost your actions, get board sign-off and publish it on your website.

Want the tools, not just the method? The The Carbon Footprint and Carbon Reduction Plan Kit kit turns this guide into ready-to-use templates, spreadsheets and printables, with an instant download.

Key takeaways
  • A PPN 006 CRP covers scope 1, scope 2 and scope 3 categories 4, 5, 6, 7 and 9, with net zero by 2050 at the latest.
  • From 1 April 2027 high-value NHS bids need all relevant scope 3, a global boundary and validated targets.
  • Use the official factor set for each country and show factor changes separately from your own cuts.
  • Most small companies are Category B under SBTi Version 2.0, in effect from 31 January 2027.
  • Offsets never reduce your footprint; report them separately and avoid 'carbon neutral' claims.

How do you write a Carbon Reduction Plan, step by step?

The job is the same whether you are a cleaning contractor, an IT consultancy or a facilities firm. These eight steps take a small organisation from nothing to a published plan; most of the elapsed time is spent waiting for data, not writing.

  • 1. Log the requests: note which buyers ask, which rule they name (PPN 006, the NHS, WPPN 006 or a corporate format) and the deadline.
  • 2. Draw the boundary: choose operational control, financial control or equity share, list every site, vehicle and lease, and write down why.
  • 3. Pick a base year: the earliest twelve months with reliable fuel, energy and refrigerant data, plus a written recalculation threshold.
  • 4. Collect activity data: litres of fuel, kWh of gas and electricity, kg of refrigerant, km travelled, tonnes of waste, spend by category.
  • 5. Calculate: activity times the official emission factor, divided by 1,000 for tonnes CO2e; scope 2 both location-based and market-based.
  • 6. Screen scope 3: all fifteen categories, measuring at least the five a CRP needs and explaining every exclusion.
  • 7. Set a target and cost the plan: a near-term absolute cut, a net zero year and actions ranked by cost per tonne.
  • 8. Approve and publish: board approval with a date, a director's sign-off, a homepage link and an annual refresh within six months of year end.

What must a PPN 006 Carbon Reduction Plan contain?

PPN 006 asks central government departments, their executive agencies and non-departmental public bodies to request a CRP as a condition of participation for contracts above £5 million a year including VAT, for procurements advertised from 24 February 2025 under the Procurement Act 2023.

The technical standard asks for a net zero commitment by 2050 at the latest, all scope 1 and 2 emissions, scope 3 categories 4 (upstream transport), 5 (waste), 6 (business travel), 7 (employee commuting) and 9 (downstream transport), the seven Kyoto gases in CO2e using UK Government factors, a stated boundary method, an annual update within six months of year end, board approval with a date and a director's sign-off, and publication on your UK website with a link from the homepage. Verification is not required, although the standard names ISO 14064-3 and ISAE 3410 as widely used verification standards.

In practice the published plan is short: a commitment, two emissions tables (base year and current year), targets, completed and planned measures, and a declaration.

How is the carbon footprint calculated? A worked example

Every line in a footprint is activity data times an emission factor. Take a composite 85-person facilities firm in Leicester with 52 vans. Its diesel use of 128,000 litres in the year to September 2026, at the 2026 UK factor of 2.58354 kg CO2e per litre, gives 330.7 tonnes; gas, petrol and refrigerant top-ups bring scope 1 to 390.3 tonnes. Electricity of 117,000 kWh at the 2026 grid factor of 0.13096 kg per kWh gives 15.3 tonnes of scope 2 on a location basis.

Adding the five CRP scope 3 categories gives the CRP total below. The full footprint, with all relevant scope 3 categories, was 1,254.1 tonnes, because purchased goods and services alone were 643.7 tonnes on a spend basis. That gap is why the NHS asks for all relevant scope 3 from April 2027.

CRP line (t CO2e)Base year FY2025Reporting year FY2026
Scope 1420.6390.3
Scope 2 (location-based)18.915.3
Scope 3: categories 4, 5, 6, 7 and 983.077.5
CRP total522.6483.1

Which scope 3 categories does a CRP need, and what changes for NHS suppliers in 2027?

A PPN 006 CRP needs five scope 3 categories. A service company that ships no goods to customers can report category 9 as not applicable, with the reason, rather than leaving it blank.

NHS England's 2027 requirements, applying from 1 April 2027 to procurements of £5 million a year and above, go further: a whole-organisation net zero commitment, a global boundary, scope 1, 2 and all relevant scope 3 following the GHG Protocol's value-chain standard, independently validated targets and disclosure of how much of the net zero target you expect to meet through offsetting. Contracts below £5 million a year but above the procurement thresholds use the 2024 CRP, which mirrors PPN 006. When we checked in November 2026, the guidance text referred to net zero by 2050 or earlier while its summary table said 2045 or before, so ask the buyer if it matters to your bid.

The practical answer is to screen all fifteen categories from the start and publish the PPN 006 view first. One dataset serves both.

Who else asks for a carbon plan outside central government?

Wales has its own note, WPPN 006, which asks Welsh Government departments, NHS Wales bodies and sponsored bodies to treat a CRP as a pass/fail selection test for contracts of £6 million or more including VAT; other templates or a scope 1, 2 and 3 report may be accepted.

Outside the UK the building blocks are the same even when the format differs. Canada's federal Standard on the Disclosure of Greenhouse Gas Emissions and the Setting of Reduction Targets applies to procurements above CAD 25 million, and suppliers show participation in the Net-Zero Challenge or an equivalent initiative. In Australia, large companies now report climate information in three groups; the corporate regulator says small businesses are not obliged to provide value-chain data and that reporters are expected to use estimates, so a small supplier can discuss a hard request rather than guess.

Private buyers ask through supplier surveys, CDP-style questionnaires and ratings platforms. They want the same facts: boundary, scopes, factor set, base year, target, actions and claims. A single dataset with an approved answer bank keeps every answer consistent.

Which emission factors should you use in 2026?

Use the official set for the country where the activity happens, and name the set and year. In the UK that is the Government's GHG conversion factors. The 2026 set was first published on 11 June 2026 and its flat file was revised on 31 July 2026 for a minor error.

The 2026 UK electricity factor fell 26% against 2025, reflecting grid decarbonisation and a new method that cuts the data lag from two years to one, so two years of grid change arrive at once. An organisation with flat electricity use will therefore see scope 2 fall with no action of its own. Show that separately in a year-on-year bridge rather than claiming it as a reduction. In the composite example, about 30 of a 34-tonne fall in scope 1 and 2 was earned and 3.8 tonnes came from factor changes.

For market-based scope 2, use your supplier's factor or certificates that meet the GHG Protocol's quality criteria, and keep the evidence. The GHG Protocol consulted on revising its Scope 2 Guidance from October 2025 to January 2026, so expect those rules to tighten.

Measure where you are

Reading helps; measuring tells you what to work on. These AI-graded assessments on AssessAll pair with this topic:

How do you set a target and a net zero date that buyers accept?

Pair a near-term absolute target (usually five years) with a long-term net zero year. The IPCC found that pathways limiting warming to 1.5C cut global net CO2 by about 45% from 2010 levels by 2030 and reach net zero around 2050; company targets are judged against methods built on such pathways.

If buyers want validated targets, check the Science Based Targets initiative's Corporate Net-Zero Standard Version 2.0, published in June 2026 and in effect from 31 January 2027, with earlier criteria open until 31 January 2028. Most small and mid-size companies fall into Category B, which sets separate scope 1 and scope 2 near-term targets; scope 3 targets are optional unless you also set a net-zero target.

The composite firm chose a 50% cut in scope 1 and 2 by FY2031 against FY2025 and net zero by 2045, with validation planned for 2027, and costed nine actions worth 255.8 tonnes a year in scope 1 and 2, led by telematics, route scheduling and electric vans.

Can you use carbon offsets in a Carbon Reduction Plan?

Credits do not reduce your footprint. The CRP reports what you emitted, and the NHS 2027 requirements ask you to disclose how much of your net zero target you expect to meet through offsetting.

Quality is a real concern. A meta-analysis led from the Max Planck Institute found that less than 16% of the credits issued to the projects it evaluated represented real emission reductions. If you use credits, report them separately, say whether they are avoidance or removal credits, and prefer durable removals for residual emissions.

Claims rules are tightening. In the UK the CMA can now enforce consumer law directly, with fines of up to 10% of worldwide turnover. In the EU, from 27 September 2026, consumer-facing claims that a product is neutral, reduced or positive because of offsetting are banned. Remove 'carbon neutral' unless you can evidence it without credits.

What are the most common mistakes?

The same handful of errors appear again and again in first-time plans. Each has a simple fix.

  • Leaving out leased vans and buildings you operate: under operational control they are in.
  • Counting a client's refrigerant leaks because your engineer did the work: the client controls the equipment.
  • Using a factor with no set, year or line reference.
  • Celebrating a scope 2 fall that the new grid factor made.
  • Writing 'not measured' for a category that is simply not applicable.
  • Promising net zero with no near-term number.
  • Adding overlapping savings from two actions on the same fuel.
  • Publishing the plan three clicks deep instead of linking it from the homepage.

How do you keep the Carbon Reduction Plan current each year?

Collect fuel, energy and charger data monthly by day 10, review a four-minute dashboard at an existing operations meeting, and check claims and rules quarterly. After year end, update the factor library with the new official set, rerun the bridge, test whether the base year needs recalculating, and take the refresh to the board within six months.

The Bodhih Carbon Footprint and Carbon Reduction Plan Kit packages this method with a formula workbook, a PPN 006-style template, a readiness check and a dated sheet of the rules. If you want to know where your team stands first, the AssessAll Sustainability Decision Judgment for Managers assessment gives a starting point, and the WOOP method on Jobulary helps turn 'publish our CRP' into a goal you reach.

Bodhih Pro Kit

Build your CRP from one dataset

The Carbon Footprint and Carbon Reduction Plan Kit gives you the workbook, template, worked examples and readiness check used in this guide.

Common questions

Questions people ask next

Is a Carbon Reduction Plan mandatory?

Not by general law, but central government buyers ask for one under PPN 006 for contracts above £5 million a year, the NHS asks for its own versions, and many private buyers now ask too.

Does a CRP need to be verified?

PPN 006 does not require verification. If a buyer asks for it, a verifier working to ISO 14064-3 or a similar standard can review your footprint.

What is the difference between a CRP and a carbon footprint?

The footprint is the measurement of your emissions. The CRP is the published plan that reports part of that footprint, commits to net zero and sets out how you will reduce it.

Which year's conversion factors should I use?

Use the set that matches your reporting period, state which one you used and apply your rule consistently. Show the effect of factor changes separately in a year-on-year bridge.

How often must a CRP be updated?

Each year, within six months of your financial year end, with board approval and a director's sign-off each time.

Can a small company get an SBTi target?

Yes. Under Version 2.0 most small companies are Category B, with separate scope 1 and scope 2 near-term targets; check the SBTi's current criteria and dates.

Do REGO-backed tariffs reduce my emissions?

They lower your market-based scope 2 figure but do not change the grid. Report location-based and market-based, and do not count certificates as a cut in your reduction plan.