How to Open a Restaurant or Cloud Kitchen: A Step-by-Step Plan
The short answer
To open a restaurant or cloud kitchen, run the opening as a ten-step project: choose the model with rough numbers, write a one-page concept, build a capital budget, sales forecast, break-even and cash runway, check a site's services before rent, list every licence with apply-by dates, design the kitchen from the menu, model what each delivery order leaves you, hire and train early, soft launch, then review numbers weekly for ninety days.
Want the tools, not just the method? The The Restaurant and Cloud Kitchen Opening Kit kit turns this guide into ready-to-use templates, spreadsheets and printables, with an instant download.
- Choose the model (dine-in, cloud kitchen, hybrid and others) before you choose a site.
- Know break-even covers or orders per day, prime cost and your lowest cash month before you sign a lease.
- A site without an extraction route, adequate gas or power, or drainage is not a kitchen, whatever the footfall.
- Count every licence back from opening day; lead times are the most common cause of delay.
- On delivery platforms, judge each order by what it leaves after tax, discounts, commission, food and packaging.
- Train for about ten paid days and run two soft-launch services before the public arrives.
What are the steps to open a restaurant or cloud kitchen?
Opening a food business is a project with ten steps. The first five are planning and the last five are building and opening. Work them in order, because each one changes the next: the model decides the site you need, the numbers decide the rent you can afford, and the licences decide the date you can open.
- 1. Choose the model: dine-in, cafe, takeaway, cloud kitchen with one or several brands, hybrid, shared kitchen, franchise or food truck.
- 2. Write a one-page concept: food, guest situation, occasion, price, competitors and what you will not do.
- 3. Build the numbers: capital budget with contingency, sales forecast by daypart, prime cost, break-even and cash runway.
- 4. Find the site: services first, then rent against forecast, then demand, then lease terms with a lawyer.
- 5. Get the licences: build the list for your address and count back apply-by dates from opening day.
- 6. Design the kitchen and choose equipment and technology from the menu and the peak hour.
- 7. Cost and test the menu, build an allergen matrix and open supplier accounts.
- 8. Join delivery platforms with contracts read and prices set from what each order leaves you.
- 9. Hire eight to ten weeks out and train for about ten paid days.
- 10. Run two soft-launch services, open, then review numbers and fixes weekly for ninety days.
Should you open a dine-in restaurant, a cloud kitchen or a hybrid?
A dine-in restaurant or cafe sells the room as well as the food. It needs more capital, a visible site and more front-of-house staff, and it gives you control over the guest's experience. A cloud kitchen, also called a dark or ghost kitchen, is delivery-only: rent and fit-out are lower, but most orders come through platforms that take commission, and your reputation lives in ratings. A cloud kitchen with several brands runs more than one delivery menu from the same kitchen so that rent, staff and ingredients are shared. A hybrid is a dine-in site that also sells takeaway and delivery, often to fill quiet hours.
Compare two or three models with five rough numbers each: capital, monthly fixed costs including wages, covers or orders per day, average spend, and variable cost percentage. Then score how well each one fits your skills and the life you want. Rough numbers are enough to rule models in or out.
| Model | Capital | Rent and site | Share of sales via apps | Main risk |
|---|---|---|---|---|
| Dine-in restaurant or cafe | Higher | Visible, footfall matters | Low to medium | High fixed costs if covers fall short |
| Cloud kitchen, one brand | Lower | Order density matters, not visibility | High | Commission and ratings |
| Cloud kitchen, several brands | Lower to medium | As above | High | Complexity and waste across menus |
| Hybrid | Higher | Visible, with delivery radius | Medium | Kitchen overload at peak |
| Shared kitchen or commissary | Lowest | Rented station | High | Limited control of space and hours |
How do you work out the numbers before you sign a lease?
Start with the capital budget: every cost before opening, including deposit and legal fees, building works, extraction, equipment, furniture, technology, licence and professional fees, smallwares and opening stock, pre-opening wages and marketing, signage, and a contingency line. Then forecast a settled month by daypart and channel: days per week, covers or orders per day and average spend for breakfast, lunch, dinner, takeaway, delivery and catering. Check it against capacity: forty seats turning one and a half times at lunch is sixty covers.
Prime cost is food, packaging and labour as a share of net sales. Break-even sales are your fixed costs plus wages divided by one minus your variable cost percentage. Divide that by your average spend and trading days and you have break-even covers or orders per day: the single most useful number to put on the wall. Finally, run a month-by-month cash runway from funding through a slower first few months. The month with the lowest cash is the one that decides whether you need more funding.
Set your own targets for food, labour and rent from your menu costing and rota rather than borrowing a rule of thumb, and reset them after eight weeks of trading.
Worked example: break-even and one delivery order for a small cafe
Here is a fictional 40-seat neighbourhood cafe with takeaway and delivery. The figures are illustrative placeholders in pounds, excluding 20% VAT, and are not a forecast for any real business. The calculation is the point: anyone can repeat it with their own numbers.
First, the month. Settled net sales are 48,150. Food and packaging are 32% of sales, labour including on-costs is 15,706, and fixed costs excluding labour are 9,295. Platform commissions, fees and funded discounts add 3,602, and card fees 524. Variable costs (food, packaging, platform and card fees) come to 40.5% of sales. Break-even sales are (9,295 + 15,706) divided by (1 minus 0.405), which is about 42,000 a month. At an average net spend of 10.52 over about 26 trading days a month, that is about 154 covers and orders a day. The forecast is about 176 a day, so sales could fall by roughly 13% before the cafe stops covering its costs.
Second, one delivery order. The customer pays 22.00 including VAT, on an app priced 10% above the in-store menu. The table follows the money.
| Line | Amount | How |
|---|---|---|
| Customer pays | 22.00 | Including 20% VAT |
| Net of VAT | 18.33 | 22.00 / 1.20 |
| Discount you fund (5%) | -0.92 | 18.33 x 0.05 |
| Commission (30% placeholder) | -5.22 | (18.33 - 0.92) x 0.30 |
| Net payout | 12.19 | 18.33 - 0.92 - 5.22 |
| Food cost (30% of in-store price) | -5.00 | 18.33 / 1.10 x 0.30 |
| Packaging | -0.55 | Box, bag, label |
| Contribution per order | 6.64 | 36% of net sales |
How do you choose a site for a restaurant or a delivery kitchen?
Judge a site in this order: can it physically be a kitchen, does the rent work at your forecast, will guests or orders come, and does the lease protect you. The kitchen question comes first because it is the one you cannot fix with marketing. Ask a qualified professional to confirm an extraction route the landlord and planners accept, gas or enough electrical capacity, water, drainage and space for a grease trap where required, waste storage and supplier access.
For dine-in, count passers-by at your busiest and quietest hours and on a weekend. For a delivery kitchen, open the apps at the site's address at lunch and dinner and count restaurants of your cuisine and delivery times within the radius where your food arrives hot. Divide rent by forecast sales before you negotiate, and take the lease to a lawyer before you sign: permitted use, term and break, rent-free period, who owns the extraction, repairs, hours, signage, assignment and guarantees.
Reading helps; measuring tells you what to work on. These AI-graded assessments on AssessAll pair with this topic:
What licences and food safety systems do you need?
Almost every country asks a new food business to register or be licensed with a food authority, and many also require a trade licence, planning or zoning use, building approval for works, fire safety approval and an inspection. Alcohol, music played to guests, outdoor seating, signage and late opening usually need separate permissions. Requirements differ by country, state and city, so ask your local authority in writing and record the date you checked.
A few examples show why lead times matter. UK councils ask food businesses to register with them a set period before trading. In India, FSSAI registration or licensing runs through the FoSCoS portal and licensed businesses need trained food safety supervisors. Check the current timings and requirements with your local food authority. In the US, the FDA published the 2026 Food Code in September 2026 as a model that each state or local health department adopts in its own version, and Australia's Standard 3.2.2A requires food safety supervisors and food handler training for most businesses that prepare and serve food.
Food safety itself is a system rather than a certificate. Most regimes build on HACCP principles from the Codex Alimentarius Commission: identify hazards, control the critical points, monitor, correct, verify and keep records. Before the soft launch you want a written food safety plan, trained handlers, an allergen matrix for every dish, cleaning schedules and temperature logs. This is educational guidance: follow your local food authority and a qualified food safety professional.
How do delivery platform commissions affect your prices?
Delivery platforms such as Swiggy, Zomato, Uber Eats, Deliveroo, DoorDash, Talabat and Grab bring orders you could not reach alone and take a share of each one through commission, fees and promotions you fund. Plans differ by platform, country and delivery model and they change, so read your own contract: what the commission is calculated on, fixed fees, who funds each promotion, how refunds are charged, how ratings affect visibility and any exclusivity.
Then model one order as in the worked example above. If the contribution is small or negative, more orders make things worse. Common responses are an app price uplift over the in-store menu where the contract allows, a shorter delivery menu of dishes with healthier margins, smaller funded discounts, and steering regular customers to your own pickup ordering, which carries only a payment fee. Go live after the kitchen is steady: first ratings stay with you.
What are the most common mistakes when opening a restaurant?
Most opening mistakes are small and early, and they compound.
- Falling for a site before checking extraction, gas, power and drainage.
- A capital budget with no contingency and no working capital.
- Forecasting from your best imagined day instead of by daypart with a slower ramp.
- Signing platform terms you have not read, and pricing delivery like dine-in.
- Leaving licences until the last month.
- Too many dishes on the opening menu, and no allergen matrix.
- Equipment arriving the day before opening with no time to test.
- Hiring late and training during service instead of before it.
- Skipping the soft launch, or going live on every platform on day one.
- Not measuring sales, food cost, labour, ratings and waste weekly from the first week.
What should you do in the first 90 days after opening?
Run a weekly loop for thirteen weeks. Measure last week's net sales, covers and orders, food cost from a stock count, labour, rating and waste against a ramped forecast. Find the cause behind anything that moved. Fix it with one owner and one date on a written fixes log. Make one or two deliberate menu or rota changes. Measure food waste from week one: UNEP's Food Waste Index Report 2024 estimated that food service accounted for about 290 million tonnes of the 1.05 billion tonnes of food wasted in 2022, and WRAP's UK hospitality study found preparation, plate waste and spoilage to be the main sources.
At day ninety, review the numbers against the plan, read what guests praise and complain about, decide on hours, radius, platforms and prices, update your lender or investors, and set three priorities for the next quarter. If you want a structured way to run all of this, the Restaurant and Cloud Kitchen Opening Kit from Bodhih Training has a workbook, forms, a countdown and a print pack for each step. Owners who want to check their own operating judgement first can take AssessAll's Small Business Operating Decision Assessment and turn the result into a development plan with Jobulary.

Plan your opening on one workbook and one wall
The Restaurant and Cloud Kitchen Opening Kit gives you the workbook, forms, countdown, print pack and templates for every step in this guide, for dine-in and cloud kitchens in any currency.
Sources
- National Restaurant Association: Report: Sales to hit $1.55T in 2026 despite challenging business environment
- UN News: With 783 million people going hungry, a fifth of all food goes to waste (UNEP Food Waste Index Report 2024)
- WRAP: Overview of waste in the UK hospitality and food service sector
- US Food and Drug Administration: FDA Food Code
- FSSAI: Food Safety Training and Certification (FoSTaC)
- Business Victoria: New food safety standards from December 2023
More from the Bodhih family
Questions people ask next
How long does it take to open a restaurant?
Once a site is secured, many openings plan around sixteen weeks for fit-out, licences, equipment, hiring and training, but the real timeline depends on the condition of the site, your local licensing lead times and the size of the works. Count back from your target date and move the date early if critical tasks slip.
Is a cloud kitchen cheaper to open than a restaurant?
Usually it needs less capital and lower rent because there is no dining room, but more of each sale goes to platform commission and you depend on ratings. Compare both models with your own numbers, including what each delivery order leaves you after commission, food and packaging.
What is prime cost in a restaurant?
Prime cost is food (and packaging) cost plus labour cost, usually shown as a percentage of net sales. It is the largest controllable cost in most food businesses. Set your own target from your menu costing and rota, then reset it from your first eight weeks of trading.
How do I calculate restaurant break-even?
Divide your monthly fixed costs plus wages by one minus your variable cost percentage to get break-even sales. Divide break-even sales by average spend per cover or order and by trading days to get break-even covers or orders per day.
Can one cloud kitchen run several brands?
Yes. Many delivery kitchens list several brands from one kitchen to share rent, staff and ingredients. Design each new brand around ingredients you already stock, and add brands one at a time once the first runs well at peak.
Do I need a soft launch?
A soft launch is not a legal requirement, but two friends-and-family services with feedback cards find problems in the kitchen, service and packaging before paying guests and first reviews do.
Which licences do I need to open a restaurant?
It depends on your country, city and what you do. Most food businesses need food business registration or a licence, a trade licence, planning or zoning use and fire safety approval; alcohol, music, outdoor seating and signage often need their own permissions. Ask your local authority in writing.
Should I join delivery apps on opening day?
Many owners wait a week or two until the kitchen is steady on dine-in, because early ratings are hard to recover. Use the time to test packaging on a real ride and check your delivery menu and prices.